How to handle claims related to inadequate temporary shoring that result in adjacent structure movement or damage.
Temporary shoring failures require careful documentation, prompt investigation, and strategic engagement with owners, insurers, and legal counsel to preserve safety, accountability, and financial viability for all parties involved.
Published July 26, 2025
Facebook X Reddit Pinterest Email
When temporary shoring fails or proves inadequate, the immediate priority is safety and stabilization. Assess the site for hazards, isolate the affected area, and implement remedial shoring to prevent further movement or collapse. Document every action with timestamped notes, photographs, and measurements of displacement. Communicate with the owner and design professionals to confirm the suspected cause, whether it involves miscalculation, improper installation, or material defects. Establish a preliminary incident report that outlines what occurred, when, and who observed it. This report should also identify potential impacts on adjacent structures, utilities, and ongoing work. Early containment reduces risk and sets the stage for an orderly response.
After initial stabilization, assemble a rapid response team to review the shoring system against project drawings and specifications. Compare the temporary works to the engineer of record’s prescriptions, noting any deviations or field changes. Investigate installation dates, worker qualifications, equipment used, and inspection logs to determine where the breakdown happened. Parallel to technical review, initiate communications with the project owner’s agent and insurer to outline known facts and proposed next steps. Establish channels for ongoing updates and deliberate on potential remedies, such as retrofitting shoring, reorienting loads, or halting adjacent work if necessary. Transparency minimizes confusion and supports claim resolution.
Align claims strategy with proven facts and responsible parties.
Documentation should extend beyond immediate observations to include as-built conditions and a clear timeline of events. Capture ground movement measurements, crack patterns in neighboring structures, and any changes in vibration or settlement readings. Record who conducted inspections, the equipment used, and the calibration status of instruments. Include copies of maintenance logs, material certifications, and communication with subcontractors responsible for installing shoring. The goal is to build an objective record that resists disputes and clarifies causation. A well-kept archive supports both risk allocation discussions and any subsequent claims handling with insurers or contract principals. Precision matters when presenting an incident in settlement negotiations.
ADVERTISEMENT
ADVERTISEMENT
Concurrently, engage the project’s design professionals to review the adequacy of the temporary works. Confirm whether the engineered shoring plan anticipated neighboring loads and the geometry of the site. Request any updates to the design, temporary modifications, or alternate methods that would restore safety without compromising the schedule. If field conditions differ from the plan, document the rationale for deviations and obtain formal approval from the engineer of record. A collaborative approach helps avoid defensiveness and moves the process toward remediation. Keep stakeholders informed of outcomes and revised timeframes, so the project remains coordinated and credible in the eyes of insurers and owners.
Practical steps to manage risk, interviews, and settlements.
Given the risk of damage to adjacent structures, the claim strategy should first establish who bears responsibility for inadequate shoring. This involves analyzing whether the contractor met industry standards, followed contract documents, and complied with applicable codes. Review whether pre-construction surveys identified existing weaknesses and whether temporary works were sized to support anticipated loads. Where deviations occurred, determine if they were authorized or remedied promptly. Document the decision-making process and provide a narrative explaining how the team arrived at safety-centered choices. A transparent approach helps prevent assignment of fault based on conjecture and positions all parties for a fair settlement or resolution.
ADVERTISEMENT
ADVERTISEMENT
Insurance coordination is a critical parallel track. Notify the insurer promptly with a factual summary of events and the preliminary analysis of causation. Provide copies of inspection logs, design reviews, and stabilization actions. Clarify the coverage applicable to temporary works, property damage, and any business interruption claims that may arise. The insurer may appoint adjusters, consultants, or defense counsel to participate in the investigation. Maintain consistent records of communications, and avoid promising outcomes that depend on unverified conclusions. Early, precise communication reduces the likelihood of coverage disputes and accelerates the path to resolution.
Steps to remediate and resume work safely.
Engage independent professionals to validate critical findings. Hire a structural engineer not connected to the project to conduct an unbiased assessment of the shoring system, its installation, and its impact on nearby structures. Use their report to test the logic of causation claims and to determine whether additional stabilization is required. The expert’s recommendations should inform both immediate safety actions and longer-term remediation plans. Seek written concurrence from the engineer of record if adjustments to the design are necessary. Independent verification adds credibility, reduces disputes, and helps tailor a settlement strategy grounded in technical reality.
Communication with affected parties should be steady, factual, and non-defensive. Explain what happened, what was done to stop it, and what steps will be taken to prevent recurrence. Provide regular updates to the owner, neighboring property owners, and tenants about progress, expected timelines, and any temporary access changes. Maintain a professional tone and avoid speculation about liability. Clear, consistent messaging supports stakeholder confidence and can influence the pace and tenor of negotiations, settlements, or court filings, should they arise. A calm, transparent stance can defuse tensions during a stressful period.
ADVERTISEMENT
ADVERTISEMENT
Settlement, recovery, and learning for future projects.
The remediation plan should prioritize safety and code compliance while preserving as much constructability as possible. Evaluate whether the temporary shoring can be augmented in place or if a full redesign is required. Consider reinforcing the adjacent support system, introducing additional struts, or redistributing loads through alternative framing. Any substantial alteration should be reviewed and approved by the engineer of record and documented as a formal change order. Implement controlled testing of the revised system and monitor for any new movement or settlements. A disciplined approach to remediation reduces the probability of recurring damage and supports a smoother re-commencement of construction activities.
Once stabilization is confirmed, re-sequence work with attention to repeating hazards and updated risk profiles. Update the project schedule to reflect revised milestones, including waiting periods for cure, inspection, and acceptance by authorities. Reassess permits, utility clearances, and safety plans to incorporate lessons learned. Communicate new schedules to all contractors and subcontractors to prevent confusion and avoid overlaps that could reintroduce risk. A deliberate phasing plan helps maintain momentum while ensuring the integrity of both temporary and permanent works in the affected area.
Settlement negotiations often hinge on demonstrating compliance with standards and timely corrective action. Gather all repair costs, inspection fees, and any downtime losses tied to the incident. Present a coherent ledger supported by the technical reports, expert opinions, and insurer communications developed during the response. Explore alternatives such as shared risk funding or indemnity arrangements that align incentives for safe performance. Document the agreed remedies, any remediation timelines, and the allocation of responsibilities for future maintenance. Refining the claim with clear, evidence-based arguments increases the likelihood of a fair resolution and reduces the chance of costly disputes.
Finally, translate the experience into practical lessons for future projects. Develop an updated checklist for temporary works that incorporates design review criteria, installation protocols, and rapid incident response procedures. Train field personnel on recognizing signs of instability and on how to escalate concerns promptly. Review contract language to ensure clear expectations about temporary shoring responsibilities, inspections, and defect remedies. By embedding the insights from this incident into standard operating procedures, teams can reduce risk, protect adjacent structures, and improve outcomes when similar challenges arise in ongoing and future work. Continuous learning strengthens safety culture and project resilience.
Related Articles
Contractor risks
Effective guidance for project managers confronting subcontractor conflicts that stall timelines, allocate blame, and test contractor responsibility while protecting client expectations and financial outcomes.
-
August 08, 2025
Contractor risks
This evergreen guide explains practical, legally sound approaches for contractors to prevent payment disputes with owners by utilizing escrow or trust accounts, clear milestones, transparent communication, and documented processes that protect all parties.
-
July 24, 2025
Contractor risks
Effective documentation of weather-related productivity impacts helps contractors substantiate time and cost relief claims, reduce disputes, and maintain steady progress, ensuring fair compensation while maintaining project schedules and quality outcomes.
-
July 22, 2025
Contractor risks
In complex projects where owner-furnished items drive system integration, preparation, clear documentation, and proactive risk management help contractors navigate claims arising from delays, ensuring smoother commissioning and fewer disputes.
-
July 16, 2025
Contractor risks
A practical, legally aware guide for contractors detailing methods to capture, substantiate, and recover additional costs triggered by owners’ modifications to project phasing, with emphasis on documentation, change orders, and risk mitigation.
-
July 21, 2025
Contractor risks
In projects demanding quick commissioning, contracting teams must clearly delineate liability boundaries, establish rigorous testing protocols, and implement proactive risk-sharing strategies that protect stakeholders while maintaining system integrity and compliance.
-
July 18, 2025
Contractor risks
When procurement stretches unfold, contractors must guard against unfair increases by negotiating clear uplift mechanisms, caps, and transparent data use to preserve project viability, schedule integrity, and relations with suppliers.
-
August 07, 2025
Contractor risks
Navigating owner-imposed supplier constraints demands strategic risk management, transparent communication, and disciplined procurement practices to safeguard project timelines, budget integrity, and collaborative contractor-owner relationships amid restricted sourcing options.
-
July 26, 2025
Contractor risks
This evergreen guide explains practical, field-tested steps contractors can take to minimize exposure, manage risk, and safeguard project outcomes when owner-provided temporary works designs arrive with minimal review or validation.
-
July 24, 2025
Contractor risks
When design duties are distributed among designers, engineers, contractors, and clients, a well-structured defense strategy emerges by clarifying responsibilities, documenting decisions, and coordinating risk sharing to minimize liability exposure.
-
August 07, 2025
Contractor risks
A practical guide to shaping site access rights and gatekeeper duties that minimize conflicts about work timing, gate access, deliveries, and daily coordination across teams, inspectors, and third parties.
-
July 23, 2025
Contractor risks
This evergreen guide outlines practical strategies for contractors facing inspection delays and stop-work orders, detailing risk assessment, proactive communication, regulatory understanding, documentation, and recovery pathways to minimize financial impact.
-
July 18, 2025
Contractor risks
Proactively addressing commissioning gaps protects projects, investors, and occupants, reducing legal exposure while improving safety outcomes, performance reliability, and regulatory compliance through disciplined processes, documentation, and early collaboration.
-
July 25, 2025
Contractor risks
A practical, step-by-step approach for builders and contractors to align owner-provided insurance terms with project realities, avoiding excessive deductibles and cover gaps that threaten schedules and budgets.
-
July 23, 2025
Contractor risks
Early supplier engagement is essential for keeping projects on schedule and within budget. This article outlines practical, field-tested steps contractors can take to align procurement milestones with design progress, budget realities, and risk management, reducing last-minute substitutions, cost escalations, and schedule slippage while preserving quality and safety throughout the project lifecycle.
-
August 07, 2025
Contractor risks
Building durable agreements requires strategic timelines for dispute resolution that align with critical project milestones, protect remedies, and minimize delays, while remaining fair to all parties involved.
-
July 18, 2025
Contractor risks
A practical, disciplined approach to reduce contractor exposure in live hospital and critical infrastructure environments, covering risk assessment, controls, communication, training, and incident response for ongoing operations.
-
July 16, 2025
Contractor risks
A practical guide to designing and applying roles and responsibilities matrices that minimize misunderstandings, clarify authority, and reduce costly disputes across client and contractor teams during every construction phase.
-
July 21, 2025
Contractor risks
This evergreen guide outlines practical, enforceable strategies contractors can implement to manage noise responsibly, meet regulatory expectations, protect stakeholders, and minimize the risk of nuisance-related breaches throughout construction projects.
-
July 19, 2025
Contractor risks
A practical guide for builders and integrators to safeguard contractor rights, manage risk, and ensure collaboration when proprietary client systems must be integrated into delivered infrastructure without compromising project timelines or quality.
-
July 15, 2025